Skip to navigation Skip to main content Skip to site map

Projects

Project Brief

Summaries of proposed guarantees are provided prior to Board consideration and before final contract signing, and they are therefore subject to change. Project briefs are disclosed after Board consideration and contract signing and reflect the terms of the project at the time of contract signature. Environmental and Social Review Summaries are provided for projects assigned an Environmental Assessment Category of A or B.

 

Project name
Bujagali Energy Ltd.
Project ID
6732
Fiscal year
2007
Status
Active
Guarantee holder
World Power Holdings Luxembourg S.à.r.l.
Investor country
Luxembourg
Host country
Uganda
Environmental category
A
Sector
Power
Gross exposure
 $115.0 million
Project type
Non-SIP
As part of its ongoing support for Uganda’s power sector, MIGA has issued $115 million in guarantee coverage for the Bujagali hydropower project. The guarantee is insuring an investment by World Power Holdings Luxembourg S.à.r.l., a subsidiary of Sithe Global (USA), against the risk of breach of contract. The insurance is for up to 20 years.

The project consists of the construction and operation of a 250 megawatt, run-of-the-river hydropower plant on the Victoria Nile by Bujagali Energy Ltd. (BEL), of which Sithe Global is a partner. The project will be developed on a build-own-operate-transfer basis. Once commissioned in 2011, the plant will re-use water flowing from two existing upstream facilities to generate electricity. The project also includes an associated Interconnection Project, which consists of a series of transmission lines to be owned and operated by the Uganda Electricity Transmission Company.

Reliable and accessible electricity is critical for Uganda’s social and economic development. Yet today, only five percent of Ugandan’s have access to electricity. Daily power shortages have stunted economic growth by an estimated one percent of the country’s gross domestic product. The Bujagali project is expected to increase supply to the national power grid at the lowest cost compared to other power generation expansion options under Uganda’s energy strategy, thereby reducing outages and costs.

Total project cost is estimated at $799 million. In addition to MIGA’s guarantee, the World Bank Group is supporting the project with $130 million in loans from the IFC and a partial risk guarantee of up to $115 million from the International Development Association. MIGA’s guarantee was considered essential to securing Sithe Global’s investment. This is the second electricity project that MIGA has supported in Uganda in two years.

Environmental Impact Information: Bujagali Hydropower Project (with IFC). For information on the environmental impact of the Bujagali project, please click here. Posted: December 22, 2006

 
Apply for an Investment Guarantee
The World Bank Group logo